How Construction Contracts Work: Ano ang Mas Maganda: Fixed-Price Contract o Cost-Plus Contract?
Hide Subtitles
Click any subtitle word to view Tagalog.com dictionary results.
Computer Shortcuts: Left / Right arrows to jump 2 seconds back or forward. +Enter or Space to toggle Play/Pause button. Full Screen Mode
Parang complicated ang mundo ng contracting sa construction. Parang ang daming kailangan basahin, isulat, malalalim na technical or legal terms. Simplify natin! Subukan nating i-explain ng basic na basic at maliwanag ang Construction Contracts na very common na ginagamit sa industry: Cost-Plus at Fixed-Price Contract. Iwas scammer na (Owner side) iwas lugi pa (Contractor side)! Simplified Construction Contracts Bespoke Construction Contracts Para sa iba pang video topics about design and materials, watch the following videos: About Roofing: https://www.youtube.com/watch?v=ZKM9yXfv-N4 https://www.youtube.com/watch?v=5VUGQV9lCXo https://www.youtube.com/watch?v=kfun1y18fQ8&t=13s https://www.youtube.com/watch?v=RyEGWFM9-ck https://www.youtube.com/watch?v=ZoHYiMK2TF4 Walls: https://www.youtube.com/watch?v=XChoYVNiuA8 https://www.youtube.com/watch?v=hbiNBTpqQd8&t=12s https://www.youtube.com/watch?v=2YkP9LkAoIg Video Playlists to enjoy: My Pet Project: https://youtube.com/playlist?list=PL1Me3E2nnw8HMzIB9P-grAUP
Architect Ed
  Mute  
Run time: 25:37
Has AI Subtitles



Video Transcript / Subtitles:( AI generated. About AI subtitles » )
00:00.0
Sa inyo naman magandang araw para matuto.
00:02.5
Welcome back sa YouTube channel natin.
00:04.2
Ako po si Architect Ed.
00:06.2
May dalawang common na klase ng kontrata sa construction
00:11.2
na pwede mong gamitin
00:13.2
kapag ka magpapatayo ka ng isang construction project.
00:16.7
At tingnan natin kung anong mas magandang klase
00:19.7
doon sa dalawang common na kontrata na iyon.
00:22.7
At kung paano mo mas mapapaganda pa
00:24.7
para maingatan mo yung sarili mo
00:26.7
mula sa panloloko at panlalamang.
00:30.2
Check this out.
00:32.2
🎵 Music 🎵
00:55.2
Kung hindi ka pa subscribe dito sa YouTube channel natin,
00:58.2
niinvite kita na i-hit yung subscribe
01:01.2
at yung notification bell
01:03.2
para updated ka every time na may bago tayong content.
01:07.2
Kung hindi mo pa napapanood yung more than 200 na mga videos natin
01:11.2
about architecture, construction, and project management,
01:16.2
panahon na para balikan mo
01:19.2
nasa playlist
01:21.2
at enjoy yung napakaraming knowledge
01:25.2
na practical magagamit mo
01:28.2
kapag magpapatayo ka ng isang project
01:31.2
o kung ikaw naman ay contractor
01:33.2
paano mo magagawang mas mabuti yung tabaho mo
01:36.2
at kung ikaw naman ay istudyante
01:38.2
ng architecture o gustong bumuha ng architecture
01:42.2
check mo yung mga videos niyan
01:45.2
marami kang mapupulot na basic knowledge.
01:50.2
Dito sa atin
01:52.2
common yung dalawang klase ng contract sa construction
01:55.2
ito yung tiyatawag na una
01:57.2
yung fixed price na contract
02:01.2
ibig sabihin
02:02.2
kung ano yung napagusapan ninyong presyo
02:05.2
at kung ano yung covered na mga trabaho
02:10.2
dun sa presyo na yon
02:11.2
eh yun na yon
02:13.2
alimbawa
02:14.2
yung project na gusto mong ipatayo
02:17.2
sabihin sa iyo ng contractor ay worth 5 million
02:21.2
5 million na yon
02:22.2
so yung nilista na scope of works
02:25.2
based dun sa plano na ginawa ng architect at engineers
02:30.2
pinresyohan ni contractor
02:32.2
yun na yung presyo nun
02:34.2
hihintayin mo na lang na matapos
02:36.2
at hanggang dun lang yung sisingilin nya
02:38.2
maliban, syempre, kung magpapadagdag ka ng tabaho
02:42.2
so basically, yan yung tiyatawag na fixed price
02:48.2
yung pangalawa naman
02:50.2
ito yung tawag na cost plus
02:53.2
yung cost plus, ibig sabihin, babayaran mo yung
02:57.2
totoong magagastos
02:59.2
doon sa project
03:01.2
ibibigay sa iyo yung mga resibo
03:03.2
at yung builder o yung contractor
03:07.2
ay hihingi sa iyo ng percentage
03:09.2
base dun sa totoong nagastos
03:12.2
yung nakita mong nagastos
03:15.2
yung real cost
03:17.2
tapos may plus sya
03:19.2
o may porsyento sya
03:21.2
kaya tinawag sya na cost plus
03:23.2
so himay-himayin pa natin
03:25.2
itongkol sa dalawang kase ng
03:27.2
kontrata na yan
03:29.2
doon muna tayo sa fixed price
03:32.2
pag sinabing fixed price
03:34.2
kagaya yung binanggit natin kanina
03:36.2
yung presyo na yun, nakalak
03:38.2
nakalak na sya
03:40.2
binanggit natin kung 5 million yung kontrata
03:42.2
5 million yung unti-unti mong babayaran sa contractor mo
03:46.2
sa nagagawa niyang progress
03:49.2
based sa natatapos niya
03:52.2
so paano nagwork itong fixed price?
03:56.2
unang-una, mayroon kayong scope of works
04:00.2
base sa plano
04:02.2
yung plano na ginawa ng architect mo
04:05.2
at ng engineers mo, may specifications yun
04:07.2
anong klase ng mga finishes, nakalista
04:09.2
tapos ano yung mga gagawin
04:13.2
ano yung tatabawin
04:15.2
yung scope of works ang tawag doon
04:17.2
so lahat ng scope of works na yun
04:19.2
may corresponding na presyo
04:21.2
at yung total nun
04:23.2
ay yun yung tiyatawag na
04:25.2
grand total
04:27.2
ng project cost
04:29.2
pag sinabing project cost
04:31.2
ito yung labor
04:33.2
ito yung materiales
04:35.2
ito yung overhead
04:37.2
contingencies, miscellaneous
04:39.2
at yung profit
04:41.2
so lahat na yun
04:43.2
all in, yung presyo
04:45.2
ay fixed
04:47.2
at yung fixed na contract
04:52.2
ay hindi mo basta-basta pwedeng baguhin
04:58.2
yung ipagagawa mo
05:00.2
kasi kapag may ipapagawa kang bago
05:03.2
labas doon sa napag-usapan nyo
05:05.2
sisingilin ka ng contractor mo
05:08.2
ng variation
05:10.2
yung tawag na
05:12.2
change order
05:14.2
kasi binago mo eh
05:16.2
kasi yung usapan nyo
05:18.2
yung nandun lang sa plano, yung nandun lang sa specifications
05:20.2
yung mga scope of works
05:22.2
pero kapag binago mo yun
05:24.2
merong kang dinagdag
05:26.2
sisingilin ka niya
05:28.2
ng change order
05:31.2
so
05:33.2
dapat istrekto kayo
05:35.2
doon sa napag-usapan nyo
05:37.2
kapag merong kang dinagdag na wala doon
05:40.2
eh ililista yun ni
05:42.2
contractor o ni builder
05:44.2
at kung siya naman meron siyang hindi nagawa
05:47.2
dapat ibawas din yun
05:49.2
sa kanya
05:51.2
so yun yung tiyatawag na fixed
05:54.2
nag-agree kayo sa isang presyo
05:56.2
final na yun
05:58.2
ano ang advantages
06:01.2
nitong fixed price contract na ito
06:05.2
unang-una, malinaw sa iyo
06:07.2
na talaga yung magagastos
06:09.2
sa umpisa pa lang
06:11.2
nagpirmahan kayo
06:13.2
alam mo na kung magkano yung babayaran mo
06:15.2
at yung contractor naman
06:17.2
magiging
06:19.2
maingat siya
06:21.2
kasi hindi siya pwedeng lumagpas
06:23.2
so
06:25.2
mabantayin niyang mabuti yung tabaho
06:27.2
at siyempre
06:29.2
gagawin niya ng mas mabilis yun
06:31.2
para
06:33.2
may extra pa siyang kita
06:35.2
ang hindi lang maganda
06:37.2
disadvantages
06:39.2
nitong fixed na presyo
06:41.2
yung fixed price
06:43.2
eh
06:47.2
baka mag-focus yung
06:49.2
contractor mo sa pagtitipid
06:51.2
yan
06:53.2
baka
06:55.2
makompromise yung quality
06:57.2
bakit? siyempre gusto niya
06:59.2
mas mabilis yung tabaho
07:01.2
mas maraming shortcut
07:03.2
at kung mas maraming yung
07:05.2
shortcut, baka nga
07:07.2
hindi maging maganda yung quality
07:09.2
maraming maging
07:11.2
backjobs
07:13.2
anyway, yung mga backjobs naman, e abulin mo sa kanya
07:15.2
pero yun nga
07:17.2
hindi mo naman kita lahat
07:19.2
hindi mo rin kita yung resibo
07:21.2
kasi kapagka fixed price
07:23.2
hindi na ibibigay sayo yung resibo
07:25.2
wala ka namang pakialam na dun sa resibo
07:27.2
discarte na yan
07:29.2
nung contractor mo
07:31.2
o nung builder mo
07:33.2
kung paano niya
07:35.2
gagamitin yung budget
07:37.2
sa punto
07:39.2
na mas advantageous
07:41.2
sa kanya
07:43.2
pwedeng maging mas advantageous
07:45.2
sa kanya, kasi nga
07:47.2
hindi mo kita
07:49.2
yung totoong naging cost
07:51.2
at isa pa
07:53.2
medyo nakalak
07:55.2
nga kayo
07:57.2
sa usapan na yun
07:59.2
mas limited yung magiging
08:01.2
control mo
08:03.2
syempre, hindi ka basta basta
08:05.2
makakapagbago, kunyari
08:07.2
tinayo na yung isang item
08:09.2
sabihin na natin
08:11.2
kulay
08:13.2
halimbawa, ay hindi pala
08:15.2
maganda yung kulay
08:17.2
contractor, hindi pala maganda yung kulay
08:19.2
pwede ba nating palitan?
08:21.2
ah
08:23.2
yan po yung napagusapan natin
08:25.2
mag change order po ako sa inyo
08:27.2
parang gano'no
08:29.2
medyo limited yung
08:31.2
control mo
08:33.2
kasi kung ano yung napagusapan yung
08:35.2
presyo, yun na yun
08:37.2
at kung may papabago ka, sisingilin
08:39.2
kanya
08:41.2
so
08:43.2
itong fixed price contact
08:47.2
hindi ito para doon
08:49.2
sa mga mabusisi
08:51.2
kasi kung mabusisi ka
08:53.2
pwedeng
08:55.2
mangyari na
08:57.2
magpapalitan mo yung isang item
08:59.2
kasi hindi mo pala gusto
09:01.2
iba pala yan sa in-expect mo
09:03.2
kaya mapapalitan mo
09:05.2
sa kanya, mabusisi ka eh
09:07.2
pero kung ikaw yung
09:09.2
klase ng owner na sige
09:11.2
tiwala ka doon sa contractor mo
09:13.2
ay para sa iyo to
09:15.2
kasi hindi mo na sakit ng ulo, hindi ka na masyado
09:17.2
magbabantay, antayin mo na lang
09:19.2
na matapos, kaya lang kung ano yung
09:21.2
ibigay sa iyo ng contractor mo
09:23.2
kung anong quality
09:25.2
kung ano yung in-specify
09:27.2
doon sa
09:29.2
specifications nung yung designer
09:31.2
yun na yun, eh paano kung hindi pala
09:33.2
maganda sa paningin mo, sa taste mo
09:35.2
eh sorry, mapapalitan mo siya
09:37.2
kung gusto mo, pero magdadagdag ka
09:39.2
kasi nga
09:41.2
fixed price
09:43.2
yung kontrata nyo
09:47.2
sa side naman ng isang
09:49.2
contractor, ang disadvantage
09:51.2
ng fixed price
09:53.2
contract, eh syempre
09:55.2
kapag meron siyang na-miss
09:57.2
na item
09:59.2
ay may nakalimutan pala
10:01.2
ako, nakalimutan ko po ito sa
10:03.2
cost eh, patay na
10:05.2
hindi niya na masisingil
10:07.2
kasi sarado yung usapan
10:09.2
so dapat
10:11.2
malinaw sa kontrata kung ano yung included
10:13.2
ano yung not included
10:15.2
inclusions
10:17.2
sa exclusions
10:19.2
kung yung
10:21.2
nakalimutan niya
10:23.2
na isama sa cost, ay hindi niya na ilagay
10:25.2
sa exclusions
10:27.2
yan, may harapan na siya doon
10:29.2
maliba na lang kung
10:31.2
maladala nyo sa talagang magandang usapan
10:33.2
at saka isa pa
10:35.2
kapag siyempre gumalaw yung
10:37.2
ekonomiya
10:39.2
nagkaroon ng malaking pangayari
10:41.2
biglang nagkaroon
10:43.2
ng malaking impact
10:45.2
sa cost
10:47.2
along the way
10:49.2
may harapan niya siyang puli niyo
10:51.2
dapat medyo maganda-ganda
10:53.2
yung ginawa niyang contingencies
10:55.2
para may leeway siya
10:57.2
may leeway siya
10:59.2
para
11:01.2
sakaling dumating yung
11:03.2
mga puntong ganon
11:05.2
yan yung mga unquantifiable
11:07.2
na dapat inanticipate niya
11:09.2
meron siyang
11:11.2
overhead
11:13.2
so yun yung isang disadvantage
11:15.2
sa part ng
11:17.2
contractor, pero minsan
11:19.2
sinasamahan niya ng konting
11:21.2
konting
11:23.2
tweaking
11:25.2
para maging balansyado
11:27.2
minsan, nilalagyan ng
11:29.2
clause na
11:31.2
kapag nagkaroon ng sudden
11:33.2
increase at
11:35.2
remarkable increase
11:37.2
sa presyo ng mga goods
11:39.2
services
11:41.2
e pwedeng
11:43.2
i-review yung
11:45.2
costing, syempre kung
11:47.2
talagang biglang sipa naman talaga
11:49.2
yung presyo, it is reasonable
11:51.2
naman to review the
11:53.2
contract, so pwedeng maglagay
11:55.2
ng ganong clause yung
11:57.2
contractor para sa protection
11:59.2
ninyong dalawa, para hindi kayo mag-away
12:01.2
so yan yung isang pwedeng
12:03.2
gawin sa
12:05.2
fixed price contract
12:07.2
pwedeng i-customize ng konti
12:11.2
doon naman tayo sa
12:13.2
cost plus
12:15.2
ano ba yung cost plus?
12:17.2
pag sinabing cost plus
12:19.2
kahit binanggit natin kanina
12:21.2
kung ano yung totoong cost
12:23.2
real cost
12:25.2
ng project
12:27.2
ano ba yung cost na yun?
12:29.2
materials
12:31.2
labor
12:33.2
equipment
12:35.2
na pa
12:37.2
yung
12:39.2
supervision
12:41.2
at utilities
12:43.2
lahat ng gastos
12:45.2
lahat ng ginastos
12:47.2
sa construction
12:49.2
whether yan man ay direct cost
12:51.2
pag sinabing direct cost, labor, materials
12:53.2
at equipment
12:55.2
or indirect cost
12:57.2
yung utilities
12:59.2
yung iba pang mga
13:03.2
cost items na
13:05.2
hindi part
13:07.2
ng pagbuo ng
13:09.2
structure
13:11.2
lahat ng yan ay ipa-factor in
13:13.2
at
13:15.2
diyan ipocompute yung plus
13:17.2
ano yung plus na yun?
13:19.2
yung kita ng builder o ng contractor
13:21.2
example
13:23.2
bumili kayo ng mga materyales
13:27.2
nagbahed ka ng labor
13:29.2
ang naging kabuo ang
13:31.2
cost noon
13:33.2
ng labor and materials mo
13:35.2
example ay 5 million
13:39.2
mag-a-agree kayo ng contractor mo
13:41.2
sa kung magkano yung
13:43.2
ipa-plus nya
13:45.2
normally, percentage yan ng cost
13:47.2
example lang
13:49.2
10 percent
13:51.2
para lang mas madaling i-compute
13:53.2
yung 10 percent na yun
13:55.2
i-add yun
13:57.2
sa cost
13:59.2
yung 5 million na binanggit natin kanina
14:01.2
na labor and materials at yung marami pang
14:03.2
cost items
14:05.2
so, kukuha siya ng
14:07.2
10 percent na plus
14:09.2
ano yung 10 percent ng 5 million
14:11.2
di 500,000
14:13.2
ang sa contractor
14:15.2
or sa builder, ganun yun yung usapan
14:17.2
na yun
14:19.2
magkano yung percento
14:21.2
na kukunin niya
14:23.2
sa lahat ng cost, ibig sabihin
14:25.2
lahat ng cost, transparent
14:27.2
lahat ng bibilhin, lahat ng babayaran
14:29.2
transparent yun sa iyo
14:31.2
lahat ng recibo at representation
14:33.2
ng mga ginastos
14:35.2
kahit hindi yan OR
14:37.2
lahat ng yan
14:39.2
ay i-sum up
14:41.2
sa cost
14:43.2
at mula dyan, kukuha ang
14:45.2
contractor mo ng percentage
14:47.2
kaya tinawag siyang
14:49.2
cost plus
14:53.2
ano ang advantages
14:55.2
o kagandahan ng cost
14:57.2
plus na klase ng usapan
14:59.2
sa construction
15:01.2
ang una
15:03.2
magfocus yung contractor mo
15:05.2
sa quality
15:07.2
syempre
15:09.2
ipapakita niya sa iyo yung mas quality
15:11.2
ng mga materiales
15:13.2
yung mas mahal
15:15.2
syempre gusto mo mas quality
15:17.2
syempre quality comes with a price
15:19.2
at
15:21.2
kung mas maganda yung quality
15:23.2
ng
15:25.2
materiales mo
15:27.2
baba, syempre
15:29.2
mas advantageous
15:31.2
yun sa iyo kasi maganda
15:33.2
yung quality ng bahay mo
15:35.2
at advantageous
15:37.2
din yun sa
15:39.2
contractor mo or sa builder mo kasi
15:41.2
mas mahal nga yung kukuha na niya ng
15:43.2
percentage
15:45.2
pero yun nga, panalo kayo pareho doon
15:47.2
hindi sya magfocus
15:49.2
sa pagtitipid
15:51.2
kailangan lang talaga lahat ng
15:53.2
recibo na binigay niya sa iyo, matiyak mo
15:55.2
may ginamit talaga doon
15:57.2
sa project mo
15:59.2
hindi niya siningitan ng iba pa
16:01.2
merong deliberation kayo dyan
16:03.2
babantayan mong mabuti yung cash flow
16:05.2
dahil alam mo yung
16:07.2
mga
16:09.2
expenditures niya, yung mga recibo niya
16:11.2
merong kang
16:13.2
kopya, nasa iyo yung original
16:15.2
tapos yung mga
16:17.2
walang recibo, syempre hindi naman lahat ng
16:19.2
bagay at servisyo ay may recibo
16:21.2
so gagawan nyo ng
16:23.2
representation kung magkano yun
16:25.2
legal naman yan
16:27.2
so mula doon, lahat ng
16:29.2
yun ay ipapakita sa iyo, isasubmit
16:31.2
sa iyo, tapos pati yung labor
16:33.2
yung payroll, ipapakita sa iyo
16:35.2
yung payroll, yung total nun
16:37.2
ay isasum
16:39.2
ipapaktorin, isasum
16:41.2
at doon niya kukunin yung kanyang
16:43.2
kita sa total nun
16:45.2
kung ilang percent yung
16:47.2
mapag-aagreehan nyo
16:49.2
yun yung isang maganda ron
16:51.2
very transparent
16:53.2
to the point na kahit
16:55.2
yung pinakamaliit na detalye
16:57.2
na binili niya
16:59.2
ay ibibigay niya sa iyo yung recibo
17:01.2
o yung representation nun
17:03.2
so very transparent
17:05.2
at
17:07.2
nakafocus siya sa
17:09.2
high quality
17:11.2
kasi nga high price
17:13.2
at ang isa pa dyan, isa pang
17:15.2
advantage, mas free ka ngayon
17:17.2
na mag-request ng mga
17:19.2
additional na tabahong, syempre pag may additional
17:21.2
gustong gusto ng contractor yan kasi
17:23.2
madagdag na naman yan
17:25.2
sa cost
17:27.2
at advantageous din naman sa iyo
17:29.2
kasi kung hindi mo nagustuhan
17:31.2
yung isang elemento na kinabit niya
17:33.2
pwede mong papalitan
17:35.2
wala ka ng change order, change order
17:37.2
kahit doon sa
17:39.2
fixed price, kasi
17:41.2
ikaw ang mas
17:43.2
masusunod e, at kung
17:45.2
gaano katagal yung project
17:47.2
nakadepende rin sa iyo yan, kung gaano mo
17:49.2
katagal pinapapalitan
17:51.2
kung matagal
17:53.2
kang mamili
17:55.2
kasi, syempre, ikaw yung
17:57.2
mamimili e, kung hindi man
17:59.2
ikaw yung mamimili, lahat nang bibilihin
18:01.2
ni contractor, ipapakiran niya sa iyo
18:03.2
kung gusto mo yun
18:05.2
o hindi, ah, ma'am
18:07.2
sir, ito po yung magandang
18:09.2
gamitin e, kaya lang
18:11.2
mas mura to dito
18:13.2
pero ito mas maganda, mas mahal nga lang, anong
18:15.2
gusto mo, ayan, so ikaw yung
18:17.2
pipili, may mga ganun
18:19.2
kaya
18:21.2
mas may
18:23.2
leverage ka, mas may
18:25.2
control ka sa quality
18:27.2
at sa pricing
18:29.2
dahil nga
18:31.2
ang contractor, basta
18:33.2
bili lang ng bilyan, ipapakita lang
18:35.2
sa iyo, kasi nga, mas gusto niya
18:37.2
yung bibili siya ng bibili
18:39.2
kasi nga, yun, doon nakabasa
18:41.2
yung kanyang porsyento
18:43.2
sa dami ng binili
18:47.2
Ano ang disadvantage
18:49.2
naman itong cost plus?
18:51.2
Siyempre yung, baka hindi mo namamalayan e
18:53.2
overshoot ka na, sa
18:55.2
budget mo
18:57.2
baka masagad na yung budget mo
18:59.2
hindi pa tapos yung project na, pero mayroon namang
19:01.2
antidote doon
19:03.2
ang antidote doon
19:05.2
mangingi ka kay
19:07.2
contractor mo ng
19:09.2
maximum
19:11.2
magkano yung maximum
19:13.2
na magagamit nating pera
19:15.2
para maitayo yan?
19:17.2
yung maximum
19:19.2
di bibigyan kanya ng maximum amount
19:21.2
ganito po, 5.5 million
19:23.2
yan, maximum
19:25.2
okay, sige, gawin natin
19:27.2
pero maximum yun
19:29.2
5.5 maximum na, usapan yan
19:31.2
sige ma'am
19:33.2
basta
19:35.2
kung sasabihan kita
19:37.2
ma'am, kung yung
19:39.2
pinili mo, lalagpas na
19:41.2
para kontrolado natin
19:43.2
o sige, so ganoon
19:45.2
meron kayong ganoon game plan
19:47.2
kasi nga, ayaw mong lumagpas
19:49.2
doon sa maximum
19:51.2
na binigay niyang
19:53.2
amount
19:55.2
pagka binigyan ka ng maximum amount
19:57.2
ni contractor, siyempre na-compute
19:59.2
yan sa isip niya, okay to, pasok to
20:01.2
yan, so pwede nyo
20:03.2
pagpagandahin yan
20:05.2
pwede nyo lagyan ng clause
20:07.2
na guaranteed
20:09.2
maximum price
20:11.2
na kung meron
20:13.2
talagang susobra, halimbawa
20:15.2
5.5 yung maximum
20:17.2
pero ang nagasos nyo lang ay 5
20:19.2
edi may sobrang
20:21.2
500,000, pwede nyo
20:23.2
ilagay doon sa usapan nyo
20:25.2
sa contract nyo, na maghahati kayo doon sa
20:27.2
magiging surplus
20:29.2
maghahatian nyo, 50-50
20:31.2
yung sobra, so in that
20:33.2
case, yung 500
20:35.2
magiging 250 kayo, di ba maganda yun
20:37.2
mas magandang laban yun
20:39.2
yun yung pwede nyo gawin
20:41.2
pwede mong ilagay yun
20:43.2
para mas masaya
20:45.2
pareho kayong magiging
20:47.2
masaya, unang una
20:49.2
maganda yung magiging kalalabasan ng bahay mo
20:51.2
kasi ikaw yung
20:53.2
namili
20:55.2
at hindi naman sya naging sky is the limit
20:57.2
pero
20:59.2
si contractor naman
21:01.2
binigay niya sa'yo yung i-expect mong maximum
21:03.2
pero ang totoo, hindi naman yun
21:05.2
nasagad, so reward system
21:07.2
so yun yung pwede nyo gawin
21:09.2
para mas mapaganda itong
21:11.2
cost plus
21:13.2
na ito
21:15.2
ngayon, ano
21:17.2
ang mas maganda
21:19.2
fixed price o yung
21:21.2
cost plus, ang sagot ko dyan
21:23.2
syempre depende sa'yo
21:25.2
titimbang timbangin mo
21:29.2
yung bang budget mo ay limited
21:31.2
kung ang budget mo
21:33.2
ay limited, dun ka lang sa
21:35.2
fixed price, kasi talagang
21:37.2
yun lang yung magiging
21:39.2
budget na sasabihin mo sa contractor mo
21:41.2
hindi siya pwedeng lumagpas dun, at
21:43.2
tatapusin niya yun sa amount na yun
21:45.2
ikaw ba, gusto mo
21:47.2
mataas yung quality
21:49.2
tapos bantay sarado mo
21:51.2
yung cash flow, yung expenses
21:53.2
eh dito ka sa cost plus
21:55.2
marami ka bang
21:57.2
oras para mag busisi
21:59.2
dito ka sa
22:01.2
cost plus
22:03.2
sa'yo ba, okay lang sa'yo, bahala
22:05.2
na si contractor, kung gano'n
22:07.2
dito ka sa fixed
22:09.2
price
22:11.2
nasa'yo ang desisyon
22:13.2
binanggit ko sa'yo yung mga advantages
22:15.2
yung mga disadvantages
22:17.2
pero karaniwan, yung mga sanayin ng magpagawa
22:19.2
at alam na nila kung paano
22:21.2
yung takbo ng
22:23.2
cost ng isang construction project
22:25.2
dito sila pumupunta sa cost plus
22:27.2
yung iba naman na baguhan
22:29.2
gusto lang nila
22:31.2
makitang tapos yung project
22:33.2
at masyado
22:35.2
antiwala nila sa contractor
22:37.2
dun sila sa fixed
22:39.2
kung ikaw naman
22:41.2
gusto mo
22:43.2
pabago-bago
22:45.2
yung binigay sa iyong plano ng architect
22:47.2
parang di mo pa ma-appreciate
22:49.2
gusto mo pa tignan
22:51.2
along the way, may pagbubago yan
22:53.2
dito ka sa
22:55.2
cost plus
22:57.2
gusto mo ba na
22:59.2
maging transparent lahat?
23:01.2
lahat ng resibo nasa'yo
23:03.2
ayun, dito ka sa
23:05.2
cost plus
23:07.2
nasa'yo talaga
23:09.2
ano yung
23:11.2
gusto mo
23:13.2
pwedeng
23:15.2
immode mo yung
23:17.2
mindset mo
23:19.2
doon sa dalawang klaseng contact na
23:21.2
binanggit natin
23:23.2
siyempre
23:25.2
ang
23:27.2
success ng kontrata
23:29.2
ay sa magandang pag-uusap
23:31.2
din yung dalawa, contractor
23:33.2
tsaka ikaw bilang owner
23:35.2
o ikaw na contractor at yung
23:37.2
client mo, nasa
23:39.2
magandang pag-uusap yan
23:41.2
kung meron kayong mga disagreements
23:43.2
gaya nung maraming
23:45.2
nag-susulat
23:47.2
sa akin
23:49.2
yung nagreklamo sila
23:51.2
nagkakalokohan
23:53.2
pag-usapan nyo muna, baka hindi naman talaga
23:55.2
kayo naglolokohan
23:57.2
baka hindi nyo lang naiintindihan ng isa't isa
23:59.2
so isettle nyo yung mga disagreements
24:01.2
kayo muna
24:03.2
bago kayo pumunta
24:05.2
sa
24:07.2
maselan na
24:09.2
proceedings ng korte
24:11.2
ayaw natin pumunta roon
24:13.2
so ang success ng kontrata
24:15.2
ano mang klaseng kontrata yan
24:17.2
ay nasa
24:19.2
intelligence mo bilang
24:21.2
owner, bilang client
24:23.2
at sa management
24:25.2
skills mo
24:27.2
bilang ikaw naman na
24:29.2
contractor
24:31.2
so yung kontrata ay usapan
24:33.2
ng dalawang partido
24:35.2
hindi yung isa lang
24:37.2
so bawat isa sa inyo ay may pananagutan
24:39.2
at may obligasyon na tiyaki na nasusunod
24:41.2
ninyo yung pinag-usapan
24:43.2
ninyo
24:45.2
sana natuto kayo ulit
24:47.2
konti lang yung aking naishare
24:49.2
pero sana marami kayong
24:51.2
nakuhang points
24:53.2
na magagamit ninyo sa inyong
24:55.2
kasalukuyang project or sa future
24:57.2
endeavors ninyo bilang isang
24:59.2
future homeowner
25:01.2
or contractor
25:03.2
maraming maraming salamat po sa inyong
25:05.2
patuloy na pagsubaybay
25:07.2
dito sa ating YouTube channel
25:09.2
at sana sa susunod pa ay
25:11.2
magkakasama tayo ulit
25:13.2
ako po si Architect Ed
25:15.2
at mag-iingat po tayo
25:17.2
have a nice day
25:19.2